Project information:

Project: New detached house with swimming pool Location: P.Penteli Time of study: 2003 Time of construction: 2003 - 2004

Our services:

  • Architectural design
  • Sustainable buildings design and methods
  • Coordination of all supporting studies
  • "Turn-Key" construction of the building

Our achievements:

  • Successful application of modern energy saving design and technology
  • Minimalisation of heating and air conditioning costs